The Community for Technology Leaders
2013 21st IEEE International Requirements Engineering Conference (RE) (2008)
Sept. 8, 2008 to Sept. 12, 2008
ISSN: 1090-705X
ISBN: 978-0-7695-3309-4
pp: 339-340
ABSTRACT
This paper proposes a method that integrates goals and scenarios modeling techniques into system project planning and scheduling. The increasing strategic importance of IT demands that system requirements need to be integrated with managerial methods, processes and tools to support their alignment with business objectives. Despite, both requirements engineering (RE) and project management (PM) lay emphasis on the importance of effort estimation, project planning, and scheduling, their applied methods and tools are imprecise and require significant manual efforts. A case study of its application and evaluation demonstrated that the method can significantly accelerate project scheduling production (>50%) and project realization (>10%) through automated schedule production.
INDEX TERMS
goal-scenario, project scheduling, RCPSP
CITATION

A. Szoke, "A Proposed Method for Automated Project Scheduling using Goals and Scenarios," 2008 16th IEEE International Requirements Engineering Conference(RE), Catalunya, 2008, pp. 339-340.
doi:10.1109/RE.2008.23
93 ms
(Ver 3.3 (11022016))