2008 International Symposiums on Information Processing Wasp Algorithm for Dynamic Scheduling Based on Manufacturing Grid May 23-May 25 ISBN: 978-0-7695-3151-9
DOI Bookmark: http://doi.ieeecomputersociety.org/10.1109/ISIP.2008.100
To resolve dynamic job scheduling problem efficiently in manufacturing grid, a manufacturing grid system based on two-layer structure is proposed. This paper applies the theory of wasp colony’s interaction with environment to dynamic job shop scheduling and constructs a wasp-based scheduling decision mechanism. This paper also analyzes urgent events and rescheduling methods to deal with them respectively. At the end, the scheduling algorithm is developed and an instance is given to confirm the above mechanism.
Citation:
Bao Zhen-qiang, Li Xiang-Qing, Zhang Dan, Wang Peng, Gao Kai-zhou, "Wasp Algorithm for Dynamic Scheduling Based on Manufacturing Grid," isip, pp.83-87, 2008 International Symposiums on Information Processing, 2008 Usage of this product signifies your acceptance of the Terms of Use. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||