loading...
 This Article 
   
 Share 
   
 Bibliographic References 
   
 Add to: 
 
Digg
Furl
Spurl
Blink
Simpy
Google
Del.icio.us
Y!MyWeb
 
 Search 
   
2008 22nd International Symposium on High Performance Computing Systems and Applications
Group-Based Optimizaton for Parallel Job Scheduling with Scojo-PECT-O
June 09-June 11
ISBN: 978-0-7695-3250-9
Typical job scheduling for parallel machines is done on a one-by-one basis because of the dynamic arrival of jobs and the different priorities of the jobs. In the general case, this does not provide the optimum solution from a global point of view. Thus, we propose an approach which selects a group of jobs from the waiting queue and hierarchically optimizes a longer-term scheduling plan. This becomes feasible because the approach is embedded in our Scojo-PECT coarse-grain time sharing scheduler which separates jobs by priority. We demonstrate that we can obtain up to a 30% improvement in relative response times.
Index Terms:
parallel job scheduling, dynamic job arrival, optimization, discrete-event simulation
Citation:
Angela C. Sodan, Arun Kanavallil, Bryan Esbaugh, "Group-Based Optimizaton for Parallel Job Scheduling with Scojo-PECT-O," hpcs, pp.102-109, 2008 22nd International Symposium on High Performance Computing Systems and Applications, 2008
Usage of this product signifies your acceptance of the Terms of Use.