Eighth Asia-Pacific Software Engineering Conference (APSEC'01) Scheduling Software Projects to Minimize the Development Time and Cost with a Given Staff Macao, China December 04-December 07 ISBN: 0-7695-1408-1
A probabilistic scheduling model for software projects is presented. The model explicitly takes a scheduling strategy as input. When the scheduling strategy is fixed, the model outputs a probability distribution for the project completion time or cost. By applying stochastic optimization techniques, schedules for software projects can be computed which minimize the development time or cost with a given staff.
Citation:
Frank Padberg, "Scheduling Software Projects to Minimize the Development Time and Cost with a Given Staff," apsec, pp.187, Eighth Asia-Pacific Software Engineering Conference (APSEC'01), 2001 Usage of this product signifies your acceptance of the Terms of Use. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||