|
| This Article | ||
| ||
| Share | ||
| Bibliographic References | ||
| Add to: | ||
| | ||
| Search | ||
| ||
| ASCII Text | x | ||
| Jose L. Salmeron, Cristina Lopez, "Forecasting Risk Impact on ERP Maintenance with Augmented Fuzzy Cognitive Maps," IEEE Transactions on Software Engineering, vol. 38, no. 2, pp. 439-452, March-April, 2012. | |||
| BibTex | x | ||
| @article{ 10.1109/TSE.2011.8, author = {Jose L. Salmeron and Cristina Lopez}, title = {Forecasting Risk Impact on ERP Maintenance with Augmented Fuzzy Cognitive Maps}, journal ={IEEE Transactions on Software Engineering}, volume = {38}, number = {2}, issn = {0098-5589}, year = {2012}, pages = {439-452}, doi = {http://doi.ieeecomputersociety.org/10.1109/TSE.2011.8}, publisher = {IEEE Computer Society}, address = {Los Alamitos, CA, USA}, } | |||
| RefWorks Procite/RefMan/Endnote | x | ||
| TY - JOUR JO - IEEE Transactions on Software Engineering TI - Forecasting Risk Impact on ERP Maintenance with Augmented Fuzzy Cognitive Maps IS - 2 SN - 0098-5589 SP439 EP452 EPD - 439-452 A1 - Jose L. Salmeron, A1 - Cristina Lopez, PY - 2012 KW - ERP KW - fuzzy cognitive maps KW - risk management KW - simulation KW - software maintenance. VL - 38 JA - IEEE Transactions on Software Engineering ER - | |||
[1] D. Chand, G. Hachey, J. Hunton, V. Owhoso, and S. Vasudevan, "A Balanced Scorecard Based Framework for Assessing the Strategic Impacts of ERP Systems," Computers in Industry, vol. 56, no. 6, pp. 558-572, 2005.
[2] V. Botta-Genoulaz and P.A. Millet, "An Investigation into the Use of ERP Systems in the Service Sector," Int'l J. Production Economics, vol. 99, nos. 1/2, pp. 202-221, 2006.
[3] D. ÓLeary, Enterprise Resource Planning Systems, Life Cycle, Electronic Commerce and Risk. Cambridge Univ. Press, 2000.
[4] M. Al-Mashari, "Enterprise Resource Planning (ERP) Systems: A Research Agenda," Industrial Management and Data Systems, vol. 102, no. 3, pp. 165-170, 2002.
[5] Booz Allen & Hamilton, "Insights Enterprise Resource Planning, Big Money Down the Drain?" Information Technology Group, http://www.boozallen.com/publications/article 658713, 2000.
[6] A.I. Nicolaou, "Quality of Postimplementation Review for Enterprise Resource Planning Systems," Int'l J. Accounting Information Systems, vol. 5, no. 1, pp. 25-49, 2004.
[7] C.-S. Yu, "Causes Influencing the Effectiveness of the Post-Implementation System," Industrial Management and Data Systems, vol. 105, no. 1, pp. 115-132, 2005.
[8] C.S.P. Ng, G. Gable, and T. Chan, "A ERP Client-Benefits-Oriented Maintenance Taxonomy," J. Systems and Software, vol. 64, no. 2, pp. 87-109, 2002.
[9] S. Jaconson, J. Sheperd, M. D'Aquila, and C. Carter, "The Enterprise Resource Planning Spending Report 2006-2011," AMR Research, http:/www.amrresearch.com/, 2007.
[10] V. Botta-Genoulaz, P.A. Millet, and B. Grabot, "A Survey on the Recent Research Literature on ERP Systems," Computers in Industry, vol. 56, no. 6, pp. 510-522, 2005.
[11] J.M. Esteves and V. Bohorquez, "An Updated ERP Systems Annotated Bibliography: 2001-2005," Comm. Assoc. for Information Systems, vol. 19, no. 8, pp. 386-446, 2007.
[12] S.G. Hirt and E.B. Swanson, "Emergent Maintenance of ERP: New Roles and Relationships," J. Software Maintenance and Evolution: Research and Practice, vol. 13, no. 6, pp. 373-397, 2001.
[13] C.S.P. Ng, G. Gable, and T. Chan, "A Revelatory Case Study into the Adequacy of Standard Maintenance Models in an ERP Context," Proc. Seventh Pacific Asia Conf. Information Systems, pp. 1039-1054, 2003.
[14] B. McNurlin, "Will Users of ERP Stay Satisfied?" MIT Sloan Management Rev., vol. 42, no. 2, p. 13, 2001.
[15] A. Dorofee and C. Alberts, "Rethinking Risk Management," Proc. NDIA Systems Eng. Conf., http://www.sei.cmu.edu/library/abstracts/ risk/uploaddorofeetutorialndia09_8819.pdf , 2009.
[16] T.H. Davenport, "Putting the Enterprise into the Enterprise System," Harvard Business Rev., vol. 76, no. 4, pp. 121-133, 1998.
[17] C.S.P. Ng, G.G. Gable, and T. Chan, "An ERP Maintenance Model," Proc. 36th Ann. Hawaii Int'l Conf. System Science, pp. 1-10, 2003, doi:10.1109/HICSS.2003.1174609.
[18] J.M. Esteves and J.A. Pastor, "An ERP Life-Cycle-Based Research Agenda," Proc. First Int'l Workshop in Enterprise Management and Resource Planning, pp. 359-371, 1999.
[19] T.C. McGinnis and Z. Huang, "Rethinking ERP Success: A New Perspective from Knowledge Management and Continuous Improvement," Information and Management, vol. 44, no. 7, pp. 626-634, 2007.
[20] T.H. Willis and A.H. Willis-Brown, "Extending the Value of ERP," Industrial Management and Data Systems, vol. 102, no. 1, pp. 35-38, 2002.
[21] S. Baldwin, "ERP's Second Wave: Maximizing the Value of ERP-Enabled Processes," Deloitte Consulting Study, http://www. ctiforum.com/technology/CRM/ wp01/downloaderp2w.pdf, 1999.
[22] C.C.H. Law, C.C. Chen, and B.J.P. Wu, "Managing the Full ERP Life-Cycle: Considerations of Maintenance and Support Requirements and IT Governance Practice as Integral Elements of the Formula for Successful ERP Adoption," Computers in Industry, vol. 61, no. 3, pp. 297-308, 2010.
[23] K. Bakker, A. Boonstra, and H. Wortmann, "Does Risk Management Contribute to IT Project Success? A Meta-Analysis of Empirical Evidence," Int'l J. Project Management, vol. 28, no. 5, pp. 493-503, 2010.
[24] G.G. Gable, D. Sedera, and T. Chan, "Re-Conceptualizing Information System Success: The IS-Impact Measurement Model" J. Assoc. for Information Systems, vol. 9, no. 7, pp. 377-408, 2008.
[25] T.F. Gattiker and D.L. Goodhue, "What Happens after ERP Implementation: Understanding the Impact of Interdependence and Differentiation on Plant-Level Outcomes," MIS Quarterly, vol. 29, no. 3, pp. 559-585, 2005.
[26] J.L. Salmeron and C. Lopez, "A Multicriteria Approach for Risks Assessment in ERP Maintenance" J. Systems and Software, vol. 83, no. 10, pp. 1941-1953, 2010.
[27] C.S.P. Ng, "A Decision Framework for Enterprise Resource Planning Maintenance and Upgrade: A Client Perspective," J. Software Maintenance and Evolution: Research and Practice, vol. 13, no. 6, pp. 431-468, 2001.
[28] C.S.P. Ng, P.-Y. Hsu, and W.-H. Tsai, "Salient Factors for Maintenance Standard Adoption in Enterprise Resource Planning Context: An Exploratory Study," Proc. 39th Ann. Hawaii Int'l Conf. System Science, vol. 8, pp. 1-10, 2006, doi: 10.1109/HICSS.2006.426.
[29] O.B. Kwon and J.J. Lee, "A Multi-Agent Intelligent System for Efficient ERP Maintenance," Expert System with Applications, vol. 21, no. 4, pp. 191-202, 2001.
[30] M.R. Imtihan, M.S. Ngadiman, and H. Haron, "An Alternative Model for ERP Maintenance Strategy," Proc. Ninth ACIS Int'l Conf. Software Eng., Artificial Intelligence, Networking, and Parallel/Distributed Computing, pp. 785-793, 2008, doi: 10.1109/SNPD.2008. 135.
[31] J. Whanga, M.-B. Lee, and K. Kim, "A Case Study on the Successful Upgrade of ERP System," Proc. Seventh Pacific Asia Conf. Information Systems, pp. 1030-1038, 2003.
[32] D.L. Olson and F. Zhao, "CIOs' Perspectives of Critical Success Factors in ERP Upgrade Projects," Enterprise Information Systems, vol. 1, no. 1, pp. 129-138, 2007.
[33] Project Management Inst. (PMI), A Guide to the Project Management Body of Knowledge (PMBOK Guide), fourth ed. Project Management Inst. (PMI), Pennsylvania, EE.UU 2008.
[34] R. Mookerjee, "Maintaining Enterprise Software Applications," Comm. ACM, vol. 48, no. 11, pp. 75-79, 2005.
[35] A. Teltumbde, "A Framework for Evaluating ERP Projects," Int'l J. Production Research, vol. 38, no. 17, pp. 4507-4520, 2000.
[36] F.W. McFarlan, "Portfolio Approach to Information Systems," Harvard Business Rev., vol. 59, no. 5, pp. 142-150, 1981.
[37] J. Rong, L. Hongzhi, Y. Jiankun, F. Tao, Z. Chenggui, and L. Junlin, "A Model Based on Information Entropy to Measure Developer Turnover Risk on Software Project," Proc. Second IEEE Int'l Conf. Computer Science and Information Technology, pp. 419-422, 2009, doi: 10.1109/ICCSIT.2009.5234813.
[38] P.L. Bannerman, "Risk and Risk Management in Software Projects: A Reassessment," J. Systems and Software, vol. 81, no. 12, pp. 2118-2133, 2008.
[39] F. Fui-Hoon Nah, S. Faja, and T. Cata, "Characteristics of ERP Software Maintenance: A Multiple Case Study," J. Software Maintenance and Evolution: Research and Practice, vol. 13, no. 6, pp. 399-414, 2001.
[40] M. Sumner, "Risk Factors in Enterprise-Wide/ERP Projects," J. Information Technology, vol. 15, no. 4, pp. 317-327, 2000.
[41] D. Aloini, R. Dulmin, and V. Mininno, "Risk Management in ERP Project Introduction: Review of the Literature," Information and Management, vol. 44, no. 6, pp. 547-567, 2007.
[42] S.-M. Huang, I.-C. Chang, S.-H. Li, and M.-T. Lin, "Assessing in ERP Projects: Identify and Prioritize the Factors," Industrial Management and Data Systems, vol. 8, no. 8, pp. 681-688, 2004.
[43] P. Poba-Nzaou, L. Raymond, and B. Fabi, "Adoption and Risk of ERP Systems in Manufacturing SMEs: A Positivist Case Study," Business Process Management J., vol. 14, no. 4, pp. 530-550, 2008.
[44] J.D. Scott and I. Vessey, "Managing Risks in Enterprise Systems Implementations," Comm. ACM, vol. 45, no. 4, pp. 74-81, 2002.
[45] I. Zafeiropoulos, K. Metaxiotis, and D. Askounis, "Dynamic Risk Management System for the Modeling, Optimal Adaptation and Implementation of an ERP System," Information Management and Computer Security, vol. 13, no. 3, pp. 212-234, 2005.
[46] C. Peng and M.B. Nunes, "Identification and Assessment of Risks Associated with ERP Post-Implementation in China," J. Enterprise Information Management, vol. 22, no. 5, pp. 587-614, 2009.
[47] G.C. Peng and M.B. Nunes, "Surfacing ERP Exploitation Risks through a Risk Ontology," Industrial Management and Data Systems, vol. 109, no. 7, pp. 926-942, 2009.
[48] Y.H. Kwak and J. Stoddard, "Project Risk Management: Lessons Learned from Software Development Environment," Technovation, vol. 24, no. 11, pp. 915-920, 2004.
[49] A.J. Dorofee, J.A. Walker, C.J. Alberts, R.P. Higuera, and R.L. Murphy, Continuous Risk Management Guidebook. SEI, Carnegie Mellon Univ., 1996.
[50] R. Axelrod, Structure of Decision: The Cognitive Maps of Political Elites. Princeton, 1976.
[51] B. Kosko, "Fuzzy Cognitive Maps," Int'l J. Man-Machine Studies, vol. 24, no. 1, pp. 65-75, 1986.
[52] E.I. Papageorgiou, C. Stylios, and P.P. Groumpos, "Unsupervised Learning Techniques for Fine-Tuning Fuzzy Cognitive Map Causal Links," Int'l J. Human-Computer Studies, vol. 64, no. 8, pp. 727-743, 2006.
[53] K-M. Osei-Bryson, "Generating Consistent Subjective Estimates of the Magnitudes of Causal Relationships in Fuzzy Cognitive maps," Computers and Operations Research, vol. 31, no. 8, pp. 1165-1175, 2004.
[54] L.M. Fu, "CAUSIM: A Rule-Based Causal Simulation System," Simulation, vol. 56, no. 4, pp. 251-256, 1991.
[55] I. Kang, S. Lee, and J. Choi, "Using Fuzzy Cognitive Map for the Relationship Management in Airline Service," Expert Systems with Applications, vol. 26, no. 4, pp. 545-555, 2004.
[56] S. Lee and I. Han, "Fuzzy Cognitive Map for the Design of EDI Controls," Information and Management, vol. 37, no. 1, pp. 37-50, 2000.
[57] G. Xirogiannis and M. Glykas, "Intelligent Modeling of E-Business Maturity," Expert Systems with Applications, vol. 32, no. 2, pp. 687-702, 2007.
[58] S. Nahmiasj and H. Rivera, "A Deterministic Model for a Repairable Item Inventory System with a Finite Repair Rate," Int'l J. Production Research, vol. 17, no. 3, pp. 215-221, 1979.
[59] B. Kitchenham, L.M. Pickard, S. Linkman, and P.W. Jones, "Modeling Software Bidding Risks," IEEE Trans. Software Eng., vol. 29, no. 6, pp. 542-554, June 2003.
[60] J.L. Salmeron, "Modelling Grey Uncertainty with Fuzzy Grey Cognitive Maps," Expert Systems with Applications, vol. 37, no. 12, pp. 7581-7588, 2010.
[61] G. Xirogiannis and M. Glykas, "Fuzzy Cognitive Maps in Business Analysis and Performance-Driven Change," IEEE Trans. Eng. Management, vol. 51, no. 3, pp. 334-351, Aug. 2004.
[62] T. Yi and G. Xiao, "Applying System Dynamics to Analyze the Impact of Incentive Factors' Allocation on Construction Cost And Risk," Proc. Int'l Conf. Machine Learning and Cybernetics, pp. 676- 680, 2008, doi: 10.1109/ICMLC. 2008. 46204 90.
[63] E. Lee, Y. Park, and J.G. Shin, "Large Engineering Project Risk Management Using a Bayesian Belief Network," Expert Systems with Applications, vol. 36, no. 3, pp. 5880-5887, 2009.
[64] C.-F. Fan and Y.-C. Yu, "BBN-Based Software Project Risk Management," J. Systems and Software, vol. 73, no. 2, pp. 193-203, 2004.
[65] D.E. Neumann, "An Enhanced Neural Network Technique for Software Risk Analysis," IEEE Trans. Software Eng., vol. 28, no. 9, pp. 904-912, Sept. 2002.
[66] B. Kosko, Fuzzy Engineering. Prentice Hall, 1996.
[67] U. Özesmi and S.L. Özesmi, "Ecological Models Based on People's Knowledge: A Multi-Step Fuzzy Cognitive Mapping Approach" Ecological Modelling, vol. 176, nos. 1/2, pp. 43-64, 2004.
[68] L. Rodriguez-Repiso, R. Setchi, and J.L. Salmeron, "Modelling IT Projects Success: Emerging Methodologies Reviewed," Technovation, vol. 27, no. 10, pp. 582-594, 2007.
[69] J.L. Salmeron, "Augmented Fuzzy Cognitive Maps for Modelling LMS Critical Success Factors," Knowledge-Based Systems, vol. 22, no. 4, pp. 275-278, 2009.
[70] M.J. Clayton, "Delphi: A Technique to Harness Expert Opinion for Critical Decision-Making Tasks in Education," Educational Psychology, vol. 17, no. 4, pp. 373-387, 1997.
[71] C. Okoli and S. Pawlowski, "The Delphi Method as a Research Tool: An Example, Design Considerations and Applications," Information and Management, vol. 42, no. 1, pp. 15-29, 2004.
[72] D. Grant and K. Osei-Bryson, "Using Fuzzy Cognitive Maps to Assess MIS Organizational Change Impact," Proc. 38th Ann. Hawaii Int'l Conf. System Sciences, pp. 1-11, 2005, doi 10.1109/HICSS.2005.658.
[73] J. Dikerson and B. Kosko, "Virtual Worlds as Fuzzy Cognitive Maps," Presence, vol. 3, no. 2, pp. 173-189, 1994.
[74] L.A. Zadeh, "Fuzzy Sets," Information Control, vol. 8, pp. 338-353, 1965.
[75] R.E. Bellman and L.A. Zadeh, "Decision-Making in a Fuzzy Environment," Management Science, vol. 17, no. 4, pp. 141-164, 1970.
[76] G. Xirogiannis, P. Chytas, M. Glykas, and G. Valiris, "Intelligent Impact Assessment of HRM to the Shareholder Value," Expert Systems with Applications, vol. 35, no. 4, pp. 2017-2031, 2008.
[77] N. Bryson, A. Mobolurin, and A. Joseph, "Generating Consensus Fuzzy Cognitive Maps," Intelligent Information Systems, vol. 8, no. 10, pp. 231-235, 1997.
[78] H.A. Linstone and M. Turoff, The Delphi Method, Techniques and Applications. Addison-Wesley, 1975.
[79] H.K. Cho, M. Turoff, and S.R. Hiltz, "The Impacts of Delphi Communication Structure on Small and Medium Sized Asynchronous Groups: Preliminary Results," Proc. 36th Ann. Hawaii Int'l Conf. System Sciences, pp. 17-26, 2002, doi: 10.1109/HICSS.2003.1173659.
[80] S. Bueno and J.L. Salmeron, "Benchmarking Main Activation Functions in Fuzzy Cognitive Maps," Expert Systems with Applications, vol. 36, no. 3, pp. 5221-5229, 2009.
[81] O. Feyzioglu, G. Buyukozkan, and M.S. Ersoy, "Supply Chain Risk Analysis with Fuzzy Cognitive Maps," Proc. IEEE Int'l Conf. Industrial Eng. and Eng. Management, pp. 1447-1451, 2007, doi:10.1109/IEEM.2007.4419432.
[82] B.P. Lientz and E.B. Swanson, "Problems in Application Software Maintenance," Comm. ACM, vol. 24, no. 1, pp. 763-769, 1981.
[83] B.W. Boehm, "Software Risk Management: Principles and Practices," IEEE Software, vol. 8, no. 1, pp. 32-41, Jan. 1991.
[84] S. Dekleva, "Delphi Study of Software Maintenance Problems," Proc. Conf. Software Maintenance, pp. 10-17, 1992.
[85] S.A. Sherer, "The Three Dimensions of Software Risk: Technical, Organizational, and Environmental," Proc. 28th Hawaii Int'l Conf. Systems Science, pp. 369-378, 1995, doi: 10.1109/HICSS.1995. 375618.
[86] M. Keil, P. Cule, K. Lyytimen, and R. Schmidt, "A Framework for Identifying Software Project Risk," Comm. ACM, no. 41, vol. 11, pp. 76-83, 1998.
[87] P. Cule, R. Schmidt, K. Lyytinen, and M. Keil, "Strategies for Heading Off IS Project Failure," Information Systems Management, vol. 17, no. 2, pp. 1-9, 2000.
[88] D.X. Houston, G.T. Mackulak, and J.S. Collofello, "Stochastic Simulation of Risk Factor Potential Effects for Software Development Risk Management," J. Systems and Software, vol. 59, no. 33, pp. 247-257, 2001.
[89] A. Mursu, K. Lyytinen, H.A. Soriyan, and M. Korpela, "Identifying Software Project Risks in Nigeria: An International Comparative Study," European J. Information Systems, vol. 12, no. 3, pp. 182-194, 2003.
[90] L. Wallace, M. Keil, and A. Rai, "Understanding Software Project Risk: A Cluster Analysis," Information and Management, vol. 42, no. 1, pp. 115-125, 2004.
[91] X.N. Lu and Q.C. Ma, "Risk Analysis in Software Development Project with Owners and Contractors," Proc. Conf. Eng. Management, pp. 789-793, 2004, doi: 10.1109/IEMC.2004.1407488.
[92] K.P. Batista, K.M. de Olivera, and N. Anquetil, "A Risk Taxonomy Proposal for Software Maintenance," Proc. 21st IEEE Int'l Conf. Software Maintenance, pp. 453-461, 2006, doi:10.1109/ICSM.2005.14.
[93] W.-M. Han and S.-J. Huang, "An Empirical Analysis of Risk Components and Performance on Software Projects," J. Systems and Software, vol. 80, no, 1, pp. 42-50, 2007.
[94] L. Zhou, A. Vasconcelos, and M. Nunes, "Supporting Decision Making in Risk Management through an Evidence-Based Information Systems Project Risk Checklist," Information Management and Computer Security, vol. 6, no. 2, pp. 166-186, 2008.
[95] J.-C. Chen and S.-J. Huang, "An Empirical Analysis of the Impact of Software Development Problem Factors on Software Maintainability," J. Systems and Software, vol. 82, no. 6, pp. 981-992, 2009.
[96] S.S. Yau and J.S. Collofello, "Some Stability Measures for Software Maintenance," IEEE Trans. Software Eng., vol. 6, no. 6, pp. 545-552, Nov. 1980.
[97] S.L. Pfleeger and S.A. Bohner, "A Framework for Software Maintenance Metrics," Proc. Conf. Software Maintenance, pp. 320-327, 1990, doi: 10.1109/ICSM.1990.131381.
[98] E. Stark, "Measurements for Managing Software Maintenance," Proc. Int'l Conf. Software Maintenance, pp. 152-161, 1996, doi:10.1109/ICSM.1996.565000.
[99] L. Wallace, M. Keil, and R. Arun, "How Software Project Risk Affects Project Performance: An Investigation of the Dimensions of Risk and an Exploratory Model," Decision Sciences, vol. 35, no. 2, pp. 289-321, 2004.
[100] H.M. Sneed and P. Brossler, "Critical Success Factors in Software Maintenance: A Case Study," Proc. Int'l Conf. Software Maintenance, pp. 190-198, 2003, doi: 10.1109/ICSM.2003.1235421.
[101] M. Schneider, E. Shnaider, A. Kandel, and G. Chew, "Automatic Construction of FCMs," Fuzzy Sets and Systems, vol. 93, no. 2, pp. 161-172, 1998.
[102] S. Lee and H. Ahn, "Fuzzy Cognitive Map Based on Structural Equation Modeling for the Design of Controls in Business-to-Consumer E-Commerce Web-Based Systems," Expert Systems with Applications, vol. 36, no. 7, pp. 10447-10460, 2009.
[103] C. Cobelli and E. Carson, Introduction to Modeling in Physiology and Medicine. Elsevier, 2008.
[104] J.P.C. Kleijen, "Validation of Models: Statistical Techniques and Data Availability," Proc. Winter Simulation Conf., pp. 647-654 1999, doi: 10.1109/WSC.1999.823147.
[105] Ö. Pala, J.A.M. Vennix, and J.P.C. Kleijnen, "Validation in Soft OR, Hard OR and System Dynamics: A Critical Comparison and Contribution to the Debate," Proc. 17th Int'l Conf. System Dynamic Soc., 1999.
[106] S. Leye, J. Himmelspach, and A.M. Uhrmacher, "A Discussion on Experimental Model Validation," Proc. 11th Int'l Conf. Computer Modelling and Simulation, pp. 161-167, 2009, doi: 10.1109/UKSIM. 2009.20.
[107] M. Landry, J.-L. Malouin, and M. Oral, "Model Validation in Operations Research," European J. Operational Research, vol. 14, no. 3, pp. 207-220, 1983.
[108] M. Oral and O. Kettani, "The Facets of the Modeling and Validation Process in Operations Research," European J. Operational Research, vol. 66, no. 2, pp. 216-234, 1993.
[109] G. Büyüközkan and D. Ruan, "Choquet Integral Based Aggregation Approach to Software Development Risk Assessment," Information Sciences, vol. 180, no. 3, pp. 441-451, 2010.
[110] L. Wallace and M. Keil, "Software Project Risks and Their Effect on Outcomes," Comm. ACM, vol. 47, no. 4, pp. 68-73, 2004.
[111] C.D. Stylios and P.P. Groumpos, "Mathematical Formulation of Fuzzy Cognitive Maps," Proc. Seventh Mediterranean Conf. Control and Automation, pp. 2251-2261, 1999.

