This Article 
   
 Share 
   
 Bibliographic References 
   
 Add to: 
 
Digg
Furl
Spurl
Blink
Simpy
Google
Del.icio.us
Y!MyWeb
 
 Search 
   
2009 Ninth International Conference on Hybrid Intelligent Systems
Application of LMBP Forecast Model in International Construction Claim
Shenyang, China
August 12-August 14
ISBN: 978-0-7695-3745-0
Recently, international construction claim plays an important role in the management of the construction contract. In this paper, aiming at the drawbacks of traditional BP arithmetic, an improved BP neural network is introduced based on the L-M arithmetic so as to accelerate the convergence speed. A forecast model of nonlinear system is set up based on the LMBP neural network by studying all of the factors which may bring on the construction claim, the possibilities in the construction claim are forecasted by the application of this network model. Finally, the simulation and practice results demonstrate the effectiveness of the method in this paper, then, a new approach is advanced for the management of construction claim to international contractors.
Index Terms:
International Construction Claim; LMBP; Forecast; Model
Citation:
Shujing Zhou, Lanjing Liu, Chao Wu, "Application of LMBP Forecast Model in International Construction Claim," his, vol. 3, pp.451-456, 2009 Ninth International Conference on Hybrid Intelligent Systems, 2009
Usage of this product signifies your acceptance of the Terms of Use.