The Community for Technology Leaders
RSS Icon
Subscribe
Pittsburgh, PA
Nov. 8, 2004 to Nov. 8, 2004
ISBN: 0-7695-2256-4
pp: 163-170
Sivakumar Viswanathan , National University of Singapore
Bharadwaj Veeravalli , National University of Singapore
Dantong Yu , Brookhaven National Laboratory, Upton, NY
Thomas G. Robertazzi , Stony Brook University, NY
ABSTRACT
In this paper, we present a resource conscious dynamic scheduling strategy for handling large volume computationally intensive loads in a Grid system involving multiple sources and sinks / processing nodes. We consider a "pull-based" strategy, wherein the processing nodes request load from the sources. We employ the Incremental Balancing Strategy (IBS) algorithm proposed in the literature and propose a buffer estimation strategy to derive optimal load distribution. Here, we consider non-time critical loads that arrive at arbitrary times with time varying buffer availability at sinks and utilize buffer reclamation techniques so as to schedule the loads. We demonstrate detailed workings of the proposed algorithm with illustrative examples using real-life parameters derived from STAR experiments in BNL for scheduling large volume loads.
INDEX TERMS
null
CITATION
Sivakumar Viswanathan, Bharadwaj Veeravalli, Dantong Yu, Thomas G. Robertazzi, "Design and Analysis of a Dynamic Scheduling Strategy with Resource Estimation for Large-Scale Grid Systems", GRID, 2004, Grid Computing, IEEE/ACM International Workshop on, Grid Computing, IEEE/ACM International Workshop on 2004, pp. 163-170, doi:10.1109/GRID.2004.19
8 ms
(Ver 2.0)

Marketing Automation Platform Marketing Automation Tool