The Community for Technology Leaders
RSS Icon
Subscribe
Los Angeles, CA
March 31, 2009 to April 2, 2009
ISBN: 978-0-7695-3507-4
pp: 167-171
ABSTRACT
A critical challenge in remanufacturing of reverse logistics is to seek for a primly production planning method. In some degree, what reverse logistics faces is one kind of indirect need, namely face to need of assembling product component again. Therefore, the disassembly sequence should be made according to the number of different callback productions. In this paper, a disassembly sequence model of callback production is built applied integer plans considering the time, cost and holding cost. The model takes minimum total cost as target function. Then, lead time and cost are controlled through adjusting constraint conditions.
INDEX TERMS
reverse logistics, production system, disassembly sequence
CITATION
Zhang Xin, Kang Jian, Wei Fu-xiang, "Study on Disassembly Planning of Production System in Reverse Logistics", CSIE, 2009, 2009 WRI World Congress on Computer Science and Information Engineering, CSIE, 2009 WRI World Congress on Computer Science and Information Engineering, CSIE 2009, pp. 167-171, doi:10.1109/CSIE.2009.429
5 ms
(Ver 2.0)

Marketing Automation Platform Marketing Automation Tool