|
| This Article | ||
| ||
| Share | ||
| Bibliographic References | ||
| Add to: | ||
| | ||
| Search | ||
| ||
2009 International Conference on Electrical, Communications, and Computers
Development of a Real Time Simulator to Test Load and Speed Control Systems of Hydroelectric Power Plants
Cholula, Puebla Mexico
February 26-February 28
ISBN: 978-0-7695-3587-6
| ASCII Text | x | ||
| Iván F. Galindo García, Saúl Rodríguez Lozano, Oscar P. Hernández De La O, "Development of a Real Time Simulator to Test Load and Speed Control Systems of Hydroelectric Power Plants," Electronics, Communications, and Computers, International Conference on, pp. 250-255, 2009 International Conference on Electrical, Communications, and Computers, 2009. | |||
| BibTex | x | ||
| @article{ 10.1109/CONIELECOMP.2009.44, author = {Iván F. Galindo García and Saúl Rodríguez Lozano and Oscar P. Hernández De La O}, title = {Development of a Real Time Simulator to Test Load and Speed Control Systems of Hydroelectric Power Plants}, journal ={Electronics, Communications, and Computers, International Conference on}, volume = {0}, year = {2009}, isbn = {978-0-7695-3587-6}, pages = {250-255}, doi = {http://doi.ieeecomputersociety.org/10.1109/CONIELECOMP.2009.44}, publisher = {IEEE Computer Society}, address = {Los Alamitos, CA, USA}, } | |||
| RefWorks Procite/RefMan/Endnote | x | ||
| TY - CONF JO - Electronics, Communications, and Computers, International Conference on TI - Development of a Real Time Simulator to Test Load and Speed Control Systems of Hydroelectric Power Plants SN - 978-0-7695-3587-6 SP250 EP255 A1 - Iván F. Galindo García, A1 - Saúl Rodríguez Lozano, A1 - Oscar P. Hernández De La O, PY - 2009 KW - real-time simulator KW - hydroelectric plant KW - control system testing VL - 0 JA - Electronics, Communications, and Computers, International Conference on ER - | |||
A real-time simulator of a hydroelectric power plant is developed and implemented. The aim of the simulator is to test the speed and load control system using hardware-in-the-loop techniques, in which the control system is connected to a real time simulator instead of being connected to real equipment. The main characteristics of the process models, hardware and software, and the tools employed for development are described. The functionality of the simulator is demonstrated with an application example.
Index Terms:
real-time simulator, hydroelectric plant, control system testing
Citation:
Iván F. Galindo García, Saúl Rodríguez Lozano, Oscar P. Hernández De La O, "Development of a Real Time Simulator to Test Load and Speed Control Systems of Hydroelectric Power Plants," conielecomp, pp.250-255, 2009 International Conference on Electrical, Communications, and Computers, 2009
Usage of this product signifies your acceptance of the Terms of Use.
